0 ratings
100pcs 5mm Red Lights LED Diodes (White Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode
Item #: 13007133

100pcs 5mm Red Lights LED Diodes (White Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light

Item #: 13007133

XCD 39

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Monday, July 20
Our Top Logistics Partners
  • fedex
  • dhl
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

High Brightness
These 3mm white blinking LEDs provide exceptional brightness, perfect for various lighting projects, ensuring visibility even in bright conditions.
Complete Set
Includes 100 resistors at 430 ohms, simplifying your setup for DC voltages between 6-12V, making it a complete kit for any DIY enthusiast.
Energy Efficient
Designed to operate at just 3V, these energy-efficient LEDs minimize power consumption while delivering reliable and vibrant flashing light.

Product Details

Shop 100pcs 5mm Red Lights LED Diodes (White Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode online at a best price in Saint Lucia. B077XB7NY2
Item Weight1 lbs (450 grams)

Who Should Buy?

Suitable For
  • Hobby Electronics

    Ideal for amateur electronics enthusiasts who enjoy DIY projects involving lighting effects and circuits.

  • Educational Purposes

    Perfect for educators and students to demonstrate basic electronic principles through hands-on experiments with LEDs.

  • Decorative Lighting

    Useful for crafters looking to add blinking light effects to decorations for events or home decor.

Not Suitable For
  • Professional Installations

    Not suitable for commercial use or professional applications where high reliability and consistent lighting are required.

  • Low-Light Areas

    May not provide sufficient brightness for larger or darker spaces needing substantial illumination.

  • Continuous Use

    Not designed for applications requiring steady light output instead of intermittent blinking effects.

Product Description

100pcs 5mm Red Lights LED Diodes (White Lens) Diffused Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop 100pcs 5mm Red Lights LED Diodes (White Lens) Online From Ubuy?

    Answer: It’s easy to shop 100pcs 5mm Red Lights LED Diodes (White Lens) online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is 100pcs 5mm Red Lights LED Diodes (White Lens) Available to Shop Online in Saint Lucia?

    Answer: Yes, at Ubuy Saint Lucia this product is available for you to shop at a reasonable price. The 100pcs 5mm Red Lights LED Diodes (White Lens) is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

EDGELEC Surface Emitting LEDs Editorial Review

No editorial reviews found

Customer Reviews & Ratings

4.0
1 customers ratings
  • 5 Star
    0%
  • 4 Star
    100%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.3/5 9,000 + reviews
Read reviews
MT
Mohd
Verified buyer

“The product received very good packaging & safe…Thank You”

16 June 2026 · via Trustpilot
SJ
Shawati
Verified buyer

“Accurate delivery timing given”

16 June 2026 · via Trustpilot
YB
Youcef
Verified buyer

“Not madly expensive like I thought, and much quicker than promised.”

15 June 2026 · via Trustpilot
LM
Leila
Verified buyer

“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”

6/7/2026 · via Trustpilot
KA
Kwame
Verified buyer

“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”

12 June 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.